September 2007:  Condition One Shop Remodeling

 

The long-awaited day has come, and now it is time to get back to work.  Back in May, I ordered a new milling machine and expected delivery sometime in late August.  Selecting the right machine and accessories seemed easy compared to arranging to have it delivered.  On top of that, finding a rigging company equipped to move it into my basement was a little more difficult.  Once I found Mike and Marty at Jamar Enterprises, I was blown away by their capabilities and professionalism.  Here's a few snapshots of before, during, and after.  This is probably as clean as the shop has ever been, and I doubt it will stay this way for long!

 

 Before  Before2  OnPallet
 "The Dungeon" Before
Another View, floor space is 11' x 13'
 Sitting on a Pallet in the Garage
 LowerSteps  TopstepsLanding  StairProtectors
 Lower steps are supported
Upper steps and landing are supported
 Stair Protectors are in place
 Landing1  Landing2  Landing3
 Moving into the doorway
 Setting on the landing
In position
 Forklift  Lowering2  Lowering2
Forklift or Big Anchor???
Come-Along and Safety Chains
 Almost Down
 JetJTM4VS  EastBench  WestBench
 Mill all set up
Main Work Area
Another Bench
 WestWall  LookingEast  Mill1
 Command Central
The Dungeon is now 11' x 30'
 Almost ready to use
 OliviaAtWork  KurtVise  HeadShot
 My 1 Year Old hard at work  Ready to make chips
 Head Shot

 

 